A Canadian mining operation faced a significant obstacle in fulfilling its Environmental Effects Monitoring (EEM) obligations under the Metal and Diamond Mining Effluent Regulations (MDMER). Effluent discharged into a large, fast-flowing river results in conditions where standard sampling methods could not be used to obtain the data required to assess for potential environmental effects. The river’s depth and swift current made conventional techniques unusable, while the rapid dilution of the effluent confined the sampling area to a small, hard-to-access zone. When a previous consultant’s design proved inadequate for these conditions, the mining operation turned to Minnow Environmental, a Trinity Consultants Canada team, for a custom solution.