AWN worked closely with Reddy Architecture + Urbanism and the wider design and construction team throughout the project. The role included reviewing proposed construction details, establishing project-specific acoustic performance criteria and providing ongoing advice as layouts, finishes, building services and specialist systems developed. AWN issued Stage 3 and Stage 4 acoustic design reports and continued to support the team during construction through technical reviews and site inspections.
A key part of the collaboration was translating acoustic targets into practical details that could be co-ordinated with architecture, interior finishes and building services. AWN developed room-by-room criteria and marked-up plans, specified suitable wall, glazing and door performances, and provided guidance on full-height construction, perimeter sealing, service penetrations and flanking paths.
AWN’s involvement extended beyond setting performance targets. The team identified acoustic risks arising from the existing building and proposed buildable responses before those conditions could become embedded in the completed fit-out.
This included detailed guidance for partition connections at façade mullions and structural soffits, acoustic seals at deflection heads, interfaces with existing wall linings, glazed-screen junctions, back-to-back audiovisual installations and cable or duct penetrations. These measures were intended to protect the overall performance of the separating construction in-situ.
The completed installation was then assessed through on-site acoustic commissioning. Testing covered airborne sound insulation between a representative selection of meeting rooms, focus rooms, open-plan areas, hot desks and the boardroom lounge, together with reverberation-time measurements in a range of enclosed and open workplace spaces.