EPA has proposed another major reset of the federal methane rules for oil and natural gas operations. Signed October 27, 2026, and published October 29, the proposal would revise New Source Performance Standards (NSPS) OOOOb and Emission Guidelines (EG) OOOOc, including requirements for well sites, associated gas, closed vent systems, control devices, process controllers, pumps, storage vessels, and gas plants.
The proposal may ultimately provide meaningful flexibility, but it does not change today’s requirements or extend existing deadlines. That distinction is critical. Operators should continue preparing for the November 30, 2026 annual report and the January 22, 2027 compliance dates while evaluating how the proposal could affect longer-term compliance strategy.
The Changes Most Likely to Affect Operations
EPA’s proposal is extensive. For many operators, however, five changes will drive the most immediate planning decisions: a potential reduced-requirement well-site category, a new control-based pathway for associated gas, a more practical approach to closed vent system leaks, and targeted relief for control devices and certain equipment, and rescission of the Super Emitter Program.
1. Reduced requirements for marginal or conventional well sites
EPA is considering two alternative ways to define a lower-requirement well-site category. Under the first option, every well at the site would need to qualify as marginal, meaning total site production would need to average no more than 15 barrels of oil equivalent per day over the prior 12 months. Under the second option, every well at the site would need to be conventional, meaning it is not drilled into an unconventional formation requiring intensive multistage hydraulic fracturing.
EPA could finalize either option. Qualifying sites would receive similar relief under both approaches. Fugitive-emissions monitoring would generally shift to quarterly audio, visual, and olfactory inspections without optical gas imaging. Certain process controllers could use low-bleed or intermittently venting designs, pumps could be routed to an existing onsite control device without requiring a new device, and liquids unloading would no longer be subject to a best management practice requirement. Associated gas would require 95% control only when methane emissions reach 20 tons per year. Storage-vessel applicability thresholds and requirements would not change.
Operators should begin screening sites now under both definitions. For the marginal-well option, that means calculating a rolling 12-month site production rate in barrels of oil equivalent per day. For the conventional-well option, it means documenting formation and completion characteristics well enough to support the classification.
2. A 95% control pathway for associated gas
The current rule generally favors routing associated gas to sales, onsite fuel, reinjection, or another beneficial use, with flaring available only under specified conditions. EPA now proposes to replace route-to-sales as the best system of emission reduction with a 95% control standard. Sales and beneficial use would remain acceptable, but any gas not routed to those outlets would need to be sent through a closed vent system to a compliant control device or flare.
This approach could remove temporary-flaring time limits and technical infeasibility demonstrations. It would also create a different compliance burden. An operator relying on a flare would need an adequately designed closed vent system and would remain subject to applicable pilot flame, alert, net heating value, visible-emissions, and engineering-certification requirements. The practical question is therefore not simply whether flaring becomes easier. It is whether each affected site has compliant control capacity and monitoring infrastructure.
3. A 24-hour repair window for closed vent system emissions
The proposal would relax one of the rule’s most rigid provisions. Under the current no-identifiable-emissions standard, any detected emission from a cover or closed vent system can be a deviation. EPA proposes that emissions repaired within 24 hours would not be treated as a deviation.
Emissions not repaired within 24 hours would be a deviation of the design requirement, but the operator would remain in compliance with the operational requirement by documenting the location and making a first attempt at repair within five days and a final repair within 30 days, unless delay of repair applies.
EPA also proposes a chronic-leaker provision. A third event involving the same cover or closed vent system during the current quarter and three prior quarters would trigger an investigative analysis within 10 days.
4. Practical updates for control devices and equipment
EPA proposes several narrower changes that could reduce avoidable deviations and unnecessary monitoring. Pilot-flame alerts could be sent to a centralized control room. A flame-monitoring data gap would not automatically be a deviation when other records demonstrate that the pilot remained lit and the issue involved data collection. A missed monthly Method 22 observation could be completed during the first 24 operating hours of the next month. EPA also clarifies that net heating value monitoring is required only where inert or other streams may lower the combined stream below the applicable minimum, which can be documented with process knowledge or engineering analysis. The continuous pilot flame requirement would not change.
Temporary mobile or skid-mounted control devices could also receive limited relief from net heating value monitoring and performance testing for up to 30 operating days per site per year, with a possible extension to 90 days using grab samples and additional records. Other proposed revisions address high-pressure process controllers at certain compressor stations, pumps already controlled by December 6, 2022, fugitive monitoring plans, centralized production facility modification triggers, tank-battery emissions determinations, liquids-unloading reporting, and equipment leaks at gas plants.
5. Recission of the Super Emitter Program
EPA proposes to rescind the Super Emitter Program in its entirety, across NSPS OOOO, OOOOa, OOOOb, and EG OOOOc. EPA cites limited participation, overlap with existing monitoring requirements, and concerns about its legal authority for the program. The July 2025 interim final rule delayed the program’s start to January 22, 2027. That date still stands unless EPA finalizes the rescission or takes separate action first.
What Operators Should Do Now
The proposal is not self-implementing. Current NSPS OOOOb and EG OOOOc requirements remain in effect unless and until EPA finalizes revisions or issues separate interim relief. Operators should avoid pausing compliance work based on expected changes.
- Keep November 30, 2026 and January 22, 2027 readiness efforts on schedule, including annual reporting, process-controller planning, closed vent system inspections, pilot-flame alerts, storage-vessel tracking, and other applicable requirements.
- Screen well sites under both the marginal and conventional options. Maintain the production, formation, and completion records needed to support potential eligibility.
- Assess associated-gas control capacity site by site. Identify where existing flares, closed vent systems, monitoring, and engineering certifications could support a 95% control pathway and where upgrades may be needed.
- Review management-of-change procedures for centralized production facilities and tank batteries. EPA’s proposed design-capacity and throughput triggers could change when emissions determinations must be revisited.
- Consider submitting comments where operating data can improve the final rule. Useful topics include marginal-well production tiers, temporary-flaring durations, the 24-hour repair window, fugitive-monitoring costs, and potential changes to the zero-emission standard for controllers and legally and practicably enforceable limit provisions.
Comments are due December 16, 2026, to Docket EPA-HQ-OAR-2025-0163. EPA has also scheduled a virtual public hearing for November 16, 2026. Because finalization before January 22, 2027 appears unlikely, operators should plan around the existing deadlines unless EPA takes additional action.
How Trinity Can Help
The proposal could reduce requirements for some facilities while shifting the compliance pathway for others. Trinity’s oil and gas team can help operators screen well sites, evaluate associated-gas and control-device implications, assess current OOOOb and OOOOc readiness, and develop technically supported comments. Contact Jared Murdock, Katie Jeziorski, or one of Trinity’s oil and gas experts to discuss how the proposal may affect your operations.