Wisconsin Ozone Standards Update

Environmental ConsultingEnvironmental Consulting
November 19, 2026
Share it with the world!

Overview of Wisconsin Ozone Nonattainment Status

Under the federal Clean Air Act and National Ambient Air Quality Standards (NAAQS), the U.S. Environmental Protection Agency (EPA) establishes ambient air concentration limits for ground-level ozone. Areas that do not meet the applicable ozone standard may be designated as nonattainment areas, which can trigger additional state implementation planning, more stringent air permitting requirements, and emission-control obligations for affected industrial facilities.

In eastern Wisconsin, particularly areas near Lake Michigan, ozone concentrations have historically been influenced by a combination of local emissions, meteorological conditions, and interstate pollutant transport. Recent judicial and administrative developments, including a 2025 court stay and significant Wisconsin actions during summer 2026, have created an evolving regulatory landscape for facilities located within Wisconsin’s ozone nonattainment areas.

Reclassification to Serious Status and Subsequent Judicial Stay

In December 2024, EPA finalized a rule reclassifying three Wisconsin nonattainment areas under the 2015 8-hour ozone NAAQS of 70 parts per billion (ppb) from Moderate to Serious nonattainment:

  • Milwaukee Area: All of Milwaukee and Ozaukee counties and portions of Racine, Washington, and Waukesha counties
  • Kenosha County Area: Portions of Kenosha County
  • Sheboygan County Area: Portions of Sheboygan County

The Serious reclassification became effective on January 16, 2025. Among other consequences, Serious classification would lower the major-source threshold for nitrogen oxides (NOx) and volatile organic compounds (VOCs) from 100 tons per year (tpy) to 50 tpy. Serious classification can also result in more stringent Nonattainment New Source Review (NNSR) permitting, which can include obtaining emission offsets and implementing the Lowest Achievable Emission Rate (LAER) controls, as well as additional Reasonably Available Control Technology (RACT) requirements.

Wisconsin subsequently challenged EPA’s action in the U.S. Court of Appeals for the Seventh Circuit. On September 5, 2025, the court stayed implementation of the Serious reclassification while the litigation proceeds.

Further administrative developments occurred in July 2026:

  1. WDNR Petition for Reconsideration – July 16, 2026: The Wisconsin Department of Natural Resources (WDNR) petitioned EPA to reconsider the Serious reclassification and requested an administrative stay. Among other arguments, Wisconsin challenged the process used by EPA and submitted technical information supporting reconsideration of the attainment determination.
  2. EPA Grants Reconsideration – July 28, 2026: EPA granted Wisconsin’s petition for reconsideration and indicated that it intends to conduct a notice-and-comment proceeding concerning the determination that the Wisconsin areas failed to attain the applicable ozone standard by the relevant attainment date.

EPA did not separately grant an administrative stay. However, the Seventh Circuit’s judicial stay remains in effect.

Current Regulatory Status: Moderate-area requirements remain applicable to the affected Wisconsin nonattainment areas while the court stay remains in place and EPA conducts its reconsideration process.

Governor’s Request to Split the Milwaukee Nonattainment Area

On June 30, 2026, Governor Tony Evers submitted a request to EPA to revise the boundaries of the existing Milwaukee ozone nonattainment area.

The current Milwaukee nonattainment area includes all of Milwaukee and Ozaukee counties and portions of Racine, Washington, and Waukesha counties. Wisconsin is requesting that EPA divide the existing area into two separate nonattainment areas while retaining the same overall geographic coverage.

Under the proposal:

  • A new Western Milwaukee Nonattainment Area would include the currently designated portions of Washington and Waukesha counties, along with inland portions of Ozaukee and Racine counties.
  • The remaining portions of the existing area would continue as a revised Milwaukee Nonattainment Area, including areas closer to the Lake Michigan shoreline.

WDNR’s technical analysis indicates that ozone conditions in the proposed western area differ from those near the Lake Michigan shoreline. WDNR has identified lake-breeze meteorology, regional pollutant transport, and shoreline ozone formation as important factors contributing to elevated ozone concentrations near Lake Michigan.

The June 2026 request also included an exceptional-event demonstration related to several high-ozone days in 2023 that Wisconsin attributes to Canadian wildfire smoke. WDNR is asking EPA to exclude qualifying event-influenced data when evaluating compliance with the ozone NAAQS.

According to WDNR, after accounting for the exceptional-event data, monitoring at the Waukesha location supports a Clean Data Determination for the proposed Western Milwaukee Nonattainment Area.

If EPA approves the boundary revision, the Milwaukee region would be regulated as two separate nonattainment areas rather than one combined area. This could affect future attainment planning, regulatory analyses, and permitting considerations for facilities depending on their location.

EPA has not yet finalized Wisconsin’s requested boundary revision.

What This Means for Permittees and Industrial Facilities

Facilities operating within Kenosha, Milwaukee, Ozaukee, Racine, Sheboygan, Washington, and Waukesha counties should continue monitoring these proceedings because future EPA or court actions could affect applicable permitting and control requirements.

While the Serious designation remains stayed, facilities must continue complying with applicable Moderate-area requirements:

  • Major Source Thresholds: The major-source threshold for NOx and VOC currently remains at 100 tpy under the applicable Moderate classification rather than the 50 tpy threshold associated with Serious classification.
  • VOC and NOx RACT Requirements: Existing Wisconsin RACT requirements remain applicable to regulated stationary sources. Wisconsin VOC requirements are primarily contained in Chapters NR 419 through NR 425, while NOx requirements are addressed in Chapter NR 428.
  • Nonattainment New Source Review: Applicable NNSR requirements continue to apply to qualifying new major sources and major modifications based on the currently effective Moderate classification.

Facilities planning expansions, equipment modifications, or new construction should closely monitor these developments. If the Seventh Circuit stay is lifted or EPA reaffirms the Serious classification following reconsideration, permitting thresholds and other compliance obligations could become more stringent.

Similarly, EPA approval of Wisconsin’s proposed Milwaukee-area boundary revision could affect how future ozone planning and permitting requirements are applied within different portions of southeastern Wisconsin.

What Facilities Should Do

  • Review Air Emissions Inventories: Evaluate actual and potential NOx and VOC emissions. Facilities with emissions between 50 and 100 tpy should pay particular attention because Serious classification could directly affect major-source applicability.
  • Confirm Facility Location: Determine whether the facility is located within the current Milwaukee, Kenosha, or Sheboygan ozone nonattainment areas and, for facilities in the Milwaukee area, whether the site would fall within the proposed Western Milwaukee or revised Milwaukee nonattainment area.
  • Monitor WDNR and EPA Actions: Track EPA’s reconsideration of the Serious reclassification, the ongoing Seventh Circuit litigation, and EPA’s review of Wisconsin’s June 2026 boundary-revision request.
  • Review Applicable RACT Requirements: Confirm compliance with applicable VOC requirements under Chapters NR 419 through NR 425 and applicable NOx requirements under Chapter NR 428, including associated monitoring, recordkeeping, and control obligations.
  • Evaluate Upcoming Projects: Facilities considering expansions, new equipment, or increases in production should evaluate how potential future changes in nonattainment classification could affect permitting strategy and project timing.

These regulatory proceedings remain active, and future EPA or court action could change both the geographic structure of Wisconsin’s ozone nonattainment areas and the stringency of permitting requirements applicable to individual facilities

Additional Resources

WDNR maintains current information regarding Wisconsin ozone designations, nonattainment classifications, attainment planning, and pending EPA actions on its ozone webpage. If you have questions about Wisconsin ozone nonattainment requirements, NOx or VOC applicability, RACT requirements, or how these pending EPA actions may affect your facility, please contact the Wisconsin office at 262.200.0200. Our team is available to assist you in understanding these changes and how they apply to your facility.

Securing our permits was essential to protecting our project timeline and advancing our goal of reaching 95% on-site renewable energy.

Lisa Bauer Lotto/Green Bay Packaging
Director of Environmental & Sustainability Programs

Related Resources

Wisconsin Ozone Standards Update
Wisconsin Ozone Standards Update
Read More
Key Takeaways from the 2026 Minnesota Conference on the Environment
Key Takeaways from the 2026 Minnesota Conference on the Environment
Read More
Beyond the Sign-In Sheet: Navigating Hazardous Waste Training
Beyond the Sign-In Sheet: Navigating Hazardous Waste Training
Read More
EPA Proposal Could Ease Permitting for Portable Turbines Used in Temporary Power
EPA Proposal Could Ease Permitting for Portable Turbines Used in Temporary Power
Read More
Food Safety Implications of SJVAPCD Amendments to Rule 4663
Food Safety Implications of SJVAPCD Amendments to Rule 4663
Read More

Related Upcoming Events

NCASI
Dec 9-10, 2026
PCWP MACT Compliance Workshop
Read More
Indiana Winter Technical Conference
Dec 3, 2026
2026 Winter Technical Meeting/Environmental Conference
Read More
NEBC Business & the Environment
Dec 8-9, 2026
NEBC Business & the Environment
Read More
SafeBridge® Global Potent Compound Congress & Expo
May 5-6, 2027
2027 SafeBridge® Global Potent Compound Congress & Expo
Read More